While solar panels and in extension, solar energy systems do not take all that much time to get installed, there are still some requisites that need to be taken care of. These requisites include conformation to local requirements, local government regulations on solar energy systems, and registering with the concerned authorities for the activation of net metering, if it is enabled for your solar energy system. Aside from that, many cities also require permits for solar energy systems in general and solar panels in particular; lets take a look at whether permits are required for solar panel installation in Dubai.

We will also look into the best solar panel supplier in UAE, Beacon Energy, and how one of the best solar companies in Dubai is making a difference in the renewable energy segment of the region.

Do you need a permit to install Solar Panels in Dubai?

Solar panels and solar energy systems require permits for installation beforehand. That is because many cities need to keep track of how many such systems have been installed, and whether or not the installation job has been done in a manner consistent with health and safety requirements. Furthermore, for solar energy systems that have net metering enabled, the local council will also ensure if proper protocol has been followed in informing the local DISCO, and whether or not the parameters are also followed.

Besides that, local governments or concerned departments will also require conformation to guidelines surrounding the installation of solar panels and solar energy systems. There are two types of no objection certificates (NOCs) required in Dubai before you can commission a solar energy system and start benefitting from the incredible efficiency of solar energy. Electrical NOC from DEWA (The Dubai Electricity and Water Authority)oversees all matters related to both power and water, and as such, is the primary body responsible for both legislating the requirements for solar energy systems being installed in both commercial and residential sites across the city, and for issuing NOCs based on physical and technical inspection, carried out by their own experts.

Before you can commission your solar energy system, your solar panels and the system will be inspected by solar energy experts from the DEWA, and they will ensure that everything is in order and all requirements have been taken care of before they issue an NOC, allowing you to progress onto the second permit needed before the system can be commissioned.

Construction/Mechanical NOC from Dubai Municipality

Once the electrical inspection has been done and DEWA gives you the greenlight to go ahead, next you will need to inform the local government or in this case, Dubai Municipality of your solar energy system. Since you will already have an NOC on electrical connections from DEWA, the DM will be concerned with the mechanical and construction side of your solar energy system. Everything from ensuring that the mounts on your solar panels are robust and follow the building’s code to local health and safety regulations on renewable energy installations will be looked at by DM, and they will ensure that structurally and mechanically, the installation is fit for the building and won’t cause any troubles. Once they are satisfied with the system, the Dubai Municipality will also issue you an NOC, and this will be the final one. After this, you will be able to commission your system and start enjoying the many benefits of using solar energy and all the efficiency it has to offer.

Why so many permits?

As stated beforehand, permits are required for two reasons: one, the local authorities will make sure that not only is the system compatible with the grid and local distribution company, but is also safe and robust enough to handle the load. If net metering is enabled on your solar energy system, the DEWA will further ensure that the electrical infrastructure of the solar energy system is reliable enough. As for the municipality, they will be more concerned with local building regulations, as a solar energy system might be cause for certain complications if not installed in accordance with local requirements. Its all for the benefit of the owner and the people around them; cities like Dubai actually encourage a move to renewable energy sources.

The best Solar Panels from the best solar company in Dubai: Beacon Energy

One of the best solar panel suppliers in UAE, Beacon Energy is making waves in UAE’s solar skyline by teaming up with one of the reputed manufacturers of solar panels in the world, CanadianSolar. By providing the region with quality products from the manufacturer, Beacon Energy aims to revolutionise solar for the region and ensure equal access of all to clean, renewable energy.

Tags: solar energy systems in Dubai, solar panel supplier in UAE, solar panel price in UAE, solar companies in Dubai, solar company in UAE